| Electrical Audit:
Electrical Chillers, Absorption Chillers, Air Compressors, Pumps, Fans, Lighting, Cooling Towers, Electrical Motors, Blowers, Air Handling Units, Power Factor Improvement, Maximum Demand Controller HVAC System: Design and Installation of Energy Efficient HVAC System. Optimization of existing HVAC system by looking into the following:
Thermal Audit: Gas/Oil Fired Boiler, Electrical Boiler, Thermic Fluid Heater, Oil Fired Furnaces, Steam distribution network, Waste Heat Recoveries Water Audit: Water Balance, Rain Water harvesting system, Reducing Water losses for Cooling tower |
|
